This course includes
Primavera
P6 video lessons, tutorials and a
Primavera
P6 Training certificate.
Video Lessons
1. Introduction to
Primavera
P6
•
Primavera
P6 16.1 Installation
•
Primavera
P6 Architecture
•
Primavera
P6 Interface
• New Project Creation in
Primavera
P6
• Work Breakdown Structure (WBS)
• Adding WBS in P6
• Activity Layouts
• Setting of Activity Layout
• Adding Activities in
Primavera
• Activity Relationships
• Adding Relationships Links
• Importing XER Files
• Exporting Projects to an XER File
• Workshop
2. Scheduling in
Primavera
in P6
• CPM Scheduling
• CPM Scheduling and Critical Path
• Scheduling in
Primavera
• Working with P6 Scheduler
• Total Float and Project Deadlines
• Must Finish By Deadlines
• Calendars in P6
• Creating Calendars
• Assigning Calendars and using Fill-Down
• Constraints
• Applying Activity Constraints
• Organizing Activities and Renumbering Activity IDs
• Exercise
3. Resource Management in P6
• Introduction to Resource Management
• Resource Concepts
• Adding Labor Resources
• Essential Resource Configuration Fields
• Adding Non-Labor Resources
• Adding Material Resources
• Resource Codes
• Adding and Administering Resource Codes
• Resource-Loading
• Assigning Resources at the WBS Level using WBS Summary
• Level of Effort: High-Level Resource Assignments
• Finding Resource Over-allocations
• Resolving Resource Over-allocations
• Exercise
4. Activity Codes
• Introduction to Activity Codes
• Creating Activity Codes
• Assigning Activity Codes
• Grouping & Filtering with Activity Codes
• Types of Activity Codes
• Multi-project report using Activity Codes
• Tallying Costs using Activity Codes
• Exercise
• Quizzes
5. Cost Management
• Cost Management Concepts
• Resource Costs
• Setting a Default Resource Rate for the Project
• Increasing Resource Rates
• Overriding Resource Raites
• Expense Costs
• Adding Expenses
• Cost Loading a Project
• Using WBS Summary ^ Level of Effort for Cost Loading
• Exercise
• Quizzes
6. Project Baselines
• Baseline Concepts
• Create a Baseline
• Displaying Baseline Data
• Baseline Fields and Data
• Updating a Project Baseline
• Copying a Baseline
• Converting a Baseline Back to a Project
• Evaluating project against a Baseline
• Building a Baseline Comparison Layout
• Building a Baseline Date Variance Layout
• Conclusion
• Exercise
• Quizzes
7. Progress Updating
• Concepts to Progressing a Schedule
• Data Date
• Actual Units, Actual Cost, Actual Fields
• Building a Activity Layout for Progressing
• Pitfalls of Percent Complete Types
• Percent Complete Fields and Settings
• Percent Complete Type
• Selection of Percent Complete Type
• Progress Spotlight Tool
• Progressing a Milestone
• Activity Progressing
• Checklist: Activity Progressing
• Progressing Resource & Cost-loaded Activities
• Progress Level of Effort and WBS Summary Activities
• Removing Progress and Fixing Mistakes
• Moving the Data Date
• Conclusion
• Exercise
• Quizzes
8. Reporting in Excel
• Introduction
• Exporting P6 Data to Excel, Reshaping and Charting
• Excel Charting Options
• Graphing Workarounds for Excel
• Creating a Budgeted vs Actual Costs Histogram
• Plotting Data in Excel
• Graphing Banana Curves
• Earned Value Graphs
9.
Primavera
P6 EPPM
• Introduction to Primnavera P6 EPPM
• Logging In
• Dashboards
• Sections, Pages and Details
• Opening and Closing Projects
• My Preferences
• Creating a New Project
• Creating a Project From a Template
• WBS Overview
• Creating and Modifying the WBS
• Views
• Opening a View
• Modification to Views
• Activities
• Adding Activities
• Relationships
• Relationship Types
• Creating and Changing Relationships
• Scheduling the Plan
• Exercise
|